01Design basis & technical requirements
A design basis records what a system must do and the conditions in which it will operate. It brings together project objectives, operating pressures and temperatures, environmental conditions, interface requirements, and the standards identified by the project team.
02Subsea & umbilical systems
Umbilical systems combine service lines that support subsea equipment. Engineering coordination addresses the relationship between electrical power, hydraulic control, chemical injection, and communication requirements rather than treating each line as an isolated purchase.
03Interface coordination
Connections between equipment packages need consistent dimensions, connection types, operating ratings, and control requirements. Interface schedules help expose mismatches before they become procurement or installation problems.
04Equipment specifications
A clear specification translates the design requirement into information a supplier can quote against. Equipment descriptions, materials, performance requirements, documentation, and inspection expectations should be stated together.
05Supplier technical review
Supplier drawings and datasheets are compared with the project requirement. Technical queries document missing information, deviations, or proposed alternatives so that acceptance decisions remain visible to the responsible project team.
06Engineering handover
Approved drawings, datasheets, revision records, and equipment information provide the technical reference for subsequent installation and maintenance. A controlled handover helps operations understand what was supplied and which requirements governed its selection.